PAST PROJECTS

Rte 5 Gene Autry Way


View Larger Map

Construction of the new Gene Autry Way Bridge westbound over the southbound I-5 and Manchester Avenue and a six-lane roadway extension to Haster Street, in Anaheim.

I-580 Galena in Reno, Nevada


View Larger Map

The I-580 Freeway Extension south of Reno, Nevada, encompasses the construction of nine bridges, including the largest concrete cathedral arch bridge in the world.

Spanish Creek Bridge


View Larger Map

An open spandral arch bridge replacing a steel truss bridge built in 1932 located in Plumas County.

Rte 215 Murrieta Widening


View Larger Map

C.C. Myers, Inc. subcontracted with General Contractor All American Asphalt to widen the medians between two single-span bridges at the Keller Road undercrossing in Riverside County.

Rte 10 Etiwanda


View Larger Map

Widening of Interstate 10 through the cities of Fontana and Rialto.

Russian River Ukiah


View Larger Map

Replacement of an existing six-span steel girder bridge with a cast-in-place concrete box girder bridge.

Doyle Drive 3 / Presidio Parkway


View Larger Map

The Southwest Section of the Presidio Parkway in San Francisco. This project, comprised of multi-agencies and Parks Departments, improves access and roadways that date back to 1936.

Hwy 50 Echo Summit


View Larger Map

Replacement of an existing rock wall during an accelerated ten day full closure of the road.

I-10 Riverside Avenue Interchange


View Larger Map

A nine-lane bridge replacement to the existing five-lane Riverside Ave. Bridge over the I-10 freeway.

Rte 5 Adobe Road


View Larger Map

Roadway rehabilitation project in progress on I-5 near Adobe Rd. in Red Bluff, CA. This project is to renew and improve the current roadway and drainage system

Temporary Bypass Structure, SF Bay

Construction of a detour to hold traffic on the Bay Bridge while the new Bay Bridge is completed along the old alignment.

I-205 Widening, Tracy

An 11 mile long project adding a lane in each direction on this critical artery from the Valley to the Bay.

Bethel Island Road Bridge

Replacement of a timber structure connecting Bethel Island to Oakley

River Road Bridge Replacement


View Larger Map

Replace the existing bridge over the Santa Ana River with a higher profile bridge. Sediment deposits have raised the river over time due, reducing the waterway opening under the bridge, and causing structural damage.

Golden Valley Road

A six-lane, twin span connection for the Cross Valley Project, helping to link the Santa Clarita Valley.

West El Camino Bridge, Sacramento

Replacement of the last timber bridge in the City of Sacramento.

SFOBB Detour Tie-In Labor Day 2009

The culmination of our project involved cutting away a section of the Bay Bridge and rolling in a replacement to detour traffic onto the Bypass.

I-5/50 Sacramento

During a series of freeway closures, removal and replacement of the concrete that makes up this signature portion of Interstate 5.

Rte 101/41 Atascadero

Widening of a bridge on Hwy 101, integrating local flavor into the structure.

Rte 59 Merced River

Removal and replacement of a 178 meter box girder bridge.

Foothill Oaks Blvd, Shingle Springs

Construction of a new connector to RedHawk Casino, and widening of US-50.

Rte 710 Los Angeles County

Replacement of barrier and widening of bridges from Firestone Blvd. to I-710/10 Separation.

SR-22

A revolutionary Design-Build project to add an HOV lane to the existing State Route 22 in Orange County.

Rte 1 Santa Cruz

Highway 1/17 Merge Lanes Project in Santa Cruz, including diversions, cofferdams, demolition, and excavations, was completed in October 2006.

Tujunga Ave Bridge

A widening of the Tujunga Avenue Bridge in the City of Los Angeles.

SFOBB Roll-In Labor Day 2007

Removal of 343 feet of the Bay Bridge, with a roll in of a precast section of road over a weekend closure.

Benicia Bridge, Hwy 680/780 Interchange

Creation of a new alignment and interchange for the new Benicia Bridge.

Rte 5 Sylmar

A Caltrans project in Northern Los Angeles County added HOV lanes in both direction on Interstate 5 in the Sylmar area.

Rte 80 Hercules

A Caltrans awarded the contract for Route 80 in Hercules, to widen Westbound 80 and added a new 3.1 mile high-occupancy-vehicle (HOV) lane.

Lozanos Rd

Demolition and replacement of a single span concrete bridge.

Hwy 57/60 Interchange

Creation of a direct connector for the HOV lanes.

Lewis Stein Road

A City of Elk Grove involved the construction of slab bridges over the Laguna Bypass Channel and Laguna Creek in Elk Grove.

Russian River Bridge, Geyserville

Replacement of a new span over the Russian River in Geyserville following an emergency closure of the original bridge.

I-680/24 Interchange Walnut Creek

In a valley east of the San Francisco Bay at the foot of Mount Diablo, lies the intersection of two major freeway routes, Interstate 680 and State Route 24

Maxwell Bridge Replacement, Napa

A bridge replacement project constructing twin 1800 foot bridges along Imola Avenue over the Napa River in Napa, California.

Carquinez Deck Replacement

The Carquinez Bridge approach, built in 1958, included addition to the deck replacement and meeting seismic standards in the new east span of the Bay Bridge

Carquinez Bridge Southern Approach


View Larger Map

Seismic retrofit at the southern approach to the Carquinez Bridge.

Lake Natoma/American River Bridge

The Lake Natoma Crossing project, involved a 5,500 foot long stretch of construction connecting commuter arteries to the north and south of downtown Folsom

City of Berkeley Overcrossing

City of Berkeley wanted a safe passage for bicycles, wheelchairs, and pedestrians to cross Interstate 80 from Berkeley's Aquatic Park on the East side of Interstate 80 to the shores of the San Francisco Bay on the West side.

Harbor Freeway Transit Project

Harbor Freeway Transit Project was designed by Caltrans to alleviate traffic congestion on one of the areas most traveled corridors.