Route 205, Tracy
PROJECT LIST:
Russian River Ukiah
Spanish Creek Bridge
I-10 Riverside Avenue Interchange
Route 5 - Adobe Road
Doyle Drive 3 / Presidio Parkway
Bethel Island Road Bridge
River Road Bridge Replacement
Route 101/41, Atascadero
I-580 Galena in Reno, Nevada
Temporary Bypass Structure, SF Bay


I-205 Open to traffic: October 2009


A joint-venture for O.C. Jones & Sons, Inc. and C.C. Myers, Inc, this Caltrans project near the town of Tracy in San Joaquin County involved widening the I-205 freeway from two to three lanes in each direction, adding 22 miles of travel way, 11 in each direction, widening 22 bridges, and rehabilitating 44 lane miles of pavement and bridge decks.

Work, extending from the Hansen Road over-
crossing to the connector separation of Route
205 and 5, and on Route 5 from the Tom Paine
Slough bridge to south of the Paradise Cut
overflow bridge, was completed in five stages.

This stretch of I-205 handles over 120,000 vehicles per day; improvements have reduced travel time during peak periods by 30 minutes.

I-205 Widening I-205"