 |
PROJECT LIST:
Route 59, Merced River
Foothill Oaks Blvd Interchange, Shingle Springs
I-580 Galena in Reno, Nevada
Route 205, Tracy
Temporary Bypass Structure
Route 710
Tujunga Ave Bridge
Route 1/Santa Cruz
Route 5, Sylmar
|
The Merced River Bridge Replacement project entails removing the existing bridge and replacing it with a 178 meter long, 12.9 meter wide four-span, CIP (cast-in-place) box girder bridge built on CIDH (cast-in-drilled-hole) pile.
|
 |