PROJECT LIST:
Route 205, Tracy
SFOBB Detour Tie-In Labor Day 2009
Golden Valley Road
West El Camino Bridge, Sacramento
Project I-5/50, Sacramento
Route 59, Merced River
Foothill Oaks Blvd, Shingle Springs
I-5 at State Rte 14 - Tunnel/Truck Bypass
SFOBB Roll-In Labor Day 2007
Benicia Bridge, Hwy 680/780 Interchange
Hwy. 57/60 Interchange
I-580 / 880 Emergency Repair
SR-22
Route 710
Tujunga Ave Bridge
Lozanos Rd
Route 1/Santa Cruz
Route 80/Hercules
Route 128/Geyserville
Lewis Stein Road
Napa Bridge
Santa Monica I-10 Freeway
680/24 Interchange Walnut Creek
Harbor Freeway Transit Project
City of Berkeley Overcrossing
Carquinez Bridge Approach Replacement
Lake Natoma/American River Bridge
Route 5, Sylmar
|
| The I-5 "Boat Section" Project in Sacramento commenced on May 30, 2008 to rehabilitate the drainage and roadway systems in place. This vital north-south link through downtown Sacramento serves more than 190,000 vehicles a day. This project required traffic restrictions on I-5 through Sacramento. | |
C.C. Myers, Inc. winning bid dropped the schedule from 305 advertised days to 114 days. Subsequently, C.C. Myers, Inc. devised an aggressive plan to reduce the impact of traffic lane restriction. Working in partnership with Caltrans, the California Trucking Association, the City of Sacramento, and the City of West Sacramento, the impact to traffic was reduced from the 114-day period to less than six weeks.
|  
|
Related articles: C.C. Myers, Inc. Awarded Downtown Sacramento Project C.C. Myers, Inc Proposes New I-5 Construction Schedule
With exceptional project management and the determination of all stakeholders involved, the project finished on time in spite of two unique obstacles: a differing site condition where the pavement concrete was significantly thicker than the original 40-year plans showed and an extreme heat wave in July with temperatures well into the 100 degree mark, even into the evening, limiting time the polyester concrete could be placed. City of Sacramento Project Info |
|
 |