PROJECT LIST:
Route 205, Tracy
SFOBB Detour Tie-In Labor Day 2009
Golden Valley Road
West El Camino Bridge, Sacramento
Project I-5/50, Sacramento
Route 59, Merced River
Foothill Oaks Blvd, Shingle Springs
I-5 at State Rte 14 - Tunnel/Truck Bypass
SFOBB Roll-In Labor Day 2007
Benicia Bridge, Hwy 680/780 Interchange
Hwy. 57/60 Interchange
I-580 / 880 Emergency Repair
SR-22
Route 710
Tujunga Ave Bridge
Lozanos Rd
Route 1/Santa Cruz
Route 80/Hercules
Route 128/Geyserville
Lewis Stein Road
Napa Bridge
Santa Monica I-10 Freeway
680/24 Interchange Walnut Creek
Harbor Freeway Transit Project
City of Berkeley Overcrossing
Carquinez Bridge Approach Replacement
Lake Natoma/American River Bridge
Route 5, Sylmar
|
On January 19, 2006, Caltrans awarded the contract for Route 80 in Hercules to C.C. Myers, Inc. The contract work limits were the Route 80 Corridor from Route 4 to the Cummings Skyway Over-Crossing.
The contract scope widened Westbound 80 and added a new 3.1 mile high-occupancy-vehicle (HOV) lane. To accommodate a new alignment, the existing California Street Bridge was demolished and reconstructed and the Willow Street Bridge widened. Additional work included the construction of six sound walls, a soil nail retaining wall, AC resurfacing, and modifications to the traffic operation and lighting systems. C.C. Myers, Inc self-performed clearing, excavation, backfill, PCC paving, and all bridge and structure work.
Work began in April 2006 with completion in October 2006. The major challenge was a 130 working days completion.
|
 |