PROJECT LIST:
Hwy 50-Echo Summit
Route 5 - Adobe Road
Bethel Island Road Bridge
River Road Bridge Replacement
I-205 Widening, Tracy
SFOBB Detour Tie-In Labor Day 2009
Golden Valley Road
West El Camino Bridge, Sacramento
Project I-5/50, Sacramento
Route 101/41, Atascadero
Route 59, Merced River
Foothill Oaks Blvd, Shingle Springs
I-5 at State Rte 14 - Tunnel/Truck Bypass
SFOBB Roll-In Labor Day 2007
Benicia Bridge, Hwy 680/780 Interchange
Hwy. 57/60 Interchange
I-580 / 880 Emergency Repair
Temporary Bypass Structure, SF Bay
SR-22
Route 710
Tujunga Ave Bridge
Lozanos Rd
Route 1/Santa Cruz
Route 80/Hercules
Route 128/Geyserville
Lewis Stein Road
Napa Bridge
Santa Monica I-10 Freeway
680/24 Interchange Walnut Creek
Harbor Freeway Transit Project
City of Berkeley Overcrossing
Carquinez Bridge Approach Replacement
Lake Natoma/American River Bridge
Route 5, Sylmar
|
ECHO SUMMIT REOPENED AHEAD OF SCHEDULE Closed the evening of 5/11/11 - Reopened at noon 5/21/11
Following an accelerated ten day full closure schedule, further complicated by fog, hail, and snow, construction of a new barrier on Highway 50 at Echo Summit repaced the deteriorating rock masonry wall. The new barrier, located on Upper Meyers Grade, mimics the original wall to preserve its visual characteristics.
The wall, built circa 1939, is surrounded by steep cut slopes and abrupt drop offs in a scenic area 7000 feet above the Lake Tahoe Basin. Replacement was performed to improve safety; the existing rock masonry had deteriorated to the point it was a concern for the traveling public, and it did not meet current State and Federal safety standards. Natural activity on this stretch of road - falling rocks and weather - as well as interaction with snow removal equipment and wayward vehicles, increased the need for this improvement.
1300 linear feet of concrete barrier slab, asphalt-concrete overlay, and storm drain improvements were also made, and new weather station equipment installed.
|
 |